30噸液壓打包機(jī)
廢紙打包機(jī),紙箱打包機(jī),
配用動力:7.5KW,
臺時(shí)產(chǎn)量:3-5個(gè)包塊,
包重:200KG,
油缸:Φ150*1支,
型號:30
公稱壓力主缸KN:300
液體*大工作壓力MPa:15
料箱尺寸長900mm,寬600mm,高:1400mm
包塊尺寸:長900mm*寬:600 *高:(500-1000)mm
包塊密度kg/m3:≥400
單次循環(huán)時(shí)間S:29
電機(jī)功率KW:7.5
油缸行程:900-1200MM
機(jī)器外形尺寸mm:長1450*寬1050*高3100。
整機(jī)重量t;1.4.
液壓打包機(jī)使用說明
一、安裝步驟
1、本機(jī)必須平穩(wěn)放在混凝土上,基礎(chǔ)視當(dāng)?shù)厍闆r決定。
2、檢查油箱底部放油口是否已關(guān)閉,確定關(guān)閉后再打開油箱頂部加油口密封蓋。
注入約60KG68#液壓油,液壓油排號視當(dāng)?shù)貧鉁丶笆褂脴?biāo)準(zhǔn)決定。[注!如果機(jī)型在60T以上,新機(jī)時(shí)必須分兩次注油,**次注入液壓油高度至油尺頂部(藍(lán)**線)。待壓板下壓至底部再加注液壓油至油尺底部(紅**線)詳細(xì)見操作說明4]
3、安裝好本機(jī)電源線,電壓及頻率視當(dāng)?shù)仉娫礇Q定,(注!電機(jī)和電器配件的電壓及頻率已按客戶訂購機(jī)器時(shí)的要求配置安裝好)常規(guī)采用三相四線制,其中三條帶電源線分別接入電相內(nèi)相應(yīng)的三個(gè)接線位,(圖7左)另一條為接地防漏電保護(hù)線,應(yīng)緊接機(jī)體外露金屬表面,以防電器漏電傷人。
二、液壓打包機(jī)操作方法:
1、通入電源:把電箱內(nèi)空氣開關(guān)(本機(jī)總開關(guān))合上,先檢查三相電源電壓是否正常,(用儀表或探電筆測試)關(guān)閉電相門,查看電相門板表面紅色電源指示燈是否亮起。
2、啟動電機(jī):把手動換向閥手柄(付圖3)往下推至*底位(機(jī)體附有操作圖標(biāo)),然后把啟動按鈕NO按下(圖5右下),(注:如裝有急停開關(guān)機(jī)型的請把急停開關(guān)按箭頭方向右旋,急停開關(guān)彈出即可),(圖5右上)如正常情況下電機(jī)啟動。
3、 檢看電機(jī)轉(zhuǎn)向:(圖8)電機(jī)啟動后,手動換向閥手柄在*下位時(shí),如壓板不能往下移。這時(shí)請必須立即查看電機(jī)旋轉(zhuǎn)方向是否正確,電機(jī)旋轉(zhuǎn)方向必須按箭頭指示方向一致。如果電機(jī)轉(zhuǎn)向相反時(shí)則機(jī)器不能正常使用,這時(shí)應(yīng)把手動換向閥手柄往上拉至中檔位。然后按下停止按鈕OFF(或急停開關(guān)按下)停止電機(jī)運(yùn)轉(zhuǎn)。切斷輸入總電源,把三相電源線其中二相線互換再接上即可。再按操作1和2重新操作,(注!必須確定電機(jī)轉(zhuǎn)向是否與箭頭指示方向一致。)
4、注入油量的關(guān)?。寒?dāng)壓板正常往下移時(shí),壓板在**次移動,移動速度是不均勻的。待壓板移至底部或移動中突然停止又或移動中噪聲加大,這種情況下應(yīng)先把手動換向閥手柄往上拉至中位,把停止開關(guān)OFF或急停開關(guān)按下,停止電機(jī)運(yùn)行。再仔細(xì)查看油箱儲油量是否足夠,如油量底于油箱高度一半時(shí),證明油量不足,這時(shí)應(yīng)再次往油箱注入適當(dāng)液壓油。這次加油量應(yīng)加至油位尺*底界線(紅**線)即可。
液壓打包機(jī)操作方便,加60kg液壓油,接上電源后打包 , 專用于一切輕泡、松散物料的打包??蓱?yīng)用于棉、羊毛、廢紙、廢紙箱、廢紙板、紗線、塑料、布匹、編織袋、針織絨、麻、麻袋、毛條、毛球、繭、蠶絲、啤酒花、麥柴、草、廢塑料袋等一切輕泡、松散物料。包型緊湊,整齊美觀,可大幅降低運(yùn)輸成本,是棉產(chǎn)區(qū)、紡織企業(yè)、超市、服裝廠、廢舊物資回收業(yè)和其他各種輕工業(yè)企業(yè)的生產(chǎn)工具 。售后保障:
本產(chǎn)品享受三包服務(wù),質(zhì)保期為:一年質(zhì)保。
服務(wù)承諾:
如有任何問題可與我們客服聯(lián)系,我們會在**時(shí)間跟您溝通處理。我們將爭取以*優(yōu)惠的價(jià)格、*優(yōu)的服務(wù)來滿足您*大的需求。
液壓打包機(jī)安裝調(diào)試
關(guān)于需要我們提供上門安裝調(diào)試的,請?jiān)诤灱s時(shí)與業(yè)務(wù)人員確認(rèn),我們工程人員會現(xiàn)揚(yáng)安裝并提供操作人員和維護(hù)人員的專業(yè)培訓(xùn)。
無償服務(wù)
我們無償為您提供排廢系統(tǒng)的整體方案,為您解決排廢過程中所遇到的難題!
我們?yōu)槟峁┧形宜驹O(shè)備的電話技術(shù)支持及解決方案,使您的設(shè)備系統(tǒng)能正常運(yùn)行,從而保證整個(gè)生產(chǎn)線的流暢工作。
質(zhì)保說明
打包機(jī)質(zhì)保一年,從出廠之日起,人為損壞,易損件,自然災(zāi)害除外。一般報(bào)修后會在8小時(shí)內(nèi)做出響應(yīng),我們技術(shù)人員會和現(xiàn)場工作人員聯(lián)系,安排人員解決處理。如人為損壞或非質(zhì)量損壞的,我們只收取配件及相應(yīng)一些費(fèi)用。質(zhì)保期外,有償提供配件及人員服務(wù)。
溫馨提示:
由于部分產(chǎn)品的外觀更換較為頻繁,因此您收到的貨品有可能與圖片不一致,請您以收到實(shí)物為準(zhǔn),同時(shí)我們盡量做到及時(shí)更新,由此給您帶來不便請多多諒解,謝謝!
液壓打包機(jī)使用說明:本機(jī)使用68#液壓油,連接電源三相380V,額定電流為25A,安裝時(shí)要有接地保護(hù),電機(jī)要根據(jù)所示方向運(yùn)轉(zhuǎn)才能啟用,否則不能啟動。油箱加入60公斤的液壓油方可啟動使用。但當(dāng)氣溫降低時(shí)液壓油濃度大,機(jī)內(nèi)的濾清器不能起到過濾作用,這時(shí)必須將濾清器拆出,待溫度恢復(fù)后,方可生新安裝使用。(注:濾清器應(yīng)每月清洗1-2次)。
溢流筏-控制該機(jī)的壓力開關(guān),旋轉(zhuǎn)調(diào)壓手轉(zhuǎn)向右轉(zhuǎn)為增壓,向左轉(zhuǎn)為減壓,出廠前已調(diào)整好壓力。但在使用過程中調(diào)壓手輪可能有變位現(xiàn)象,導(dǎo)致壓力升高或降低,這時(shí)需要生新調(diào)節(jié)壓力,調(diào)壓時(shí)應(yīng)在運(yùn)轉(zhuǎn)中進(jìn)行,同時(shí)把壓板降至*低位置,調(diào)整溢流筏的調(diào)壓手輪,調(diào)整壓力不能高于或低于壓力表所示的范圍,*佳壓力的OMPA(100KG/1cm2)。旁桿-增強(qiáng)壓的剛性和起導(dǎo)向作用,每次使用前應(yīng)加油,起潤滑作用。
行程開關(guān)-控制該機(jī)的啟動和停止的作用,因此要經(jīng)常檢查、維修、保養(yǎng)。手動轉(zhuǎn)向閥-控制壓板向上向下,停止的開關(guān)。
1、手動轉(zhuǎn)向閥打向下檔位時(shí)壓板自動向下工作,當(dāng)廢紙壓到結(jié)實(shí)狀態(tài)時(shí),那阻力大于壓力:壓板不能再向下壓,應(yīng)把手動轉(zhuǎn)向閥打向空檔位置,停止加壓,如果長期處于加壓狀態(tài),會導(dǎo)致液壓,電機(jī)、油泵長時(shí)間處于超負(fù)荷狀態(tài)而使各機(jī)件損壞。
2、手動轉(zhuǎn)向閥打向升檔位置,壓板自動向上升到*高的位置,由行程開關(guān)控制自停,這時(shí)應(yīng)把手動轉(zhuǎn)向空檔位置。完成一個(gè)工作程序。
30 tons of vertical hydraulic balers
Waste paper baler, carton packer,
Equipped with power: 7.5KW,
Taiwan when the output: 3-5 mass,
Package weight: 200KG,
Cylinder: Φ150 * 1,
Easy to operate, plus 60kg hydraulic oil,
Connected to the power after packaging, dedicated to all light foam, loose material packaging. It can be used in cotton, wool, waste paper, waste paper box, waste paperboard, yarn, plastic, cloth, woven bag, knitted cashmere, hemp, sack, top, hair ball, cocoon, silk, hops, , Waste plastic bags and all the light foam, loose material. It is a necessary production tool for cotton producing areas, textile enterprises, supermarkets, garment factories, waste materials recycling industry and other light industrial enterprises.
30 tons of hydraulic balers
Model: 30
Nominal pressure master cylinder KN: 300
Liquid maximum working pressure MPa: 15
Box size 900mm long, width 600mm, height: 1400mm
Package Size: Length 900mm * Width: 600 * Height: (500-1000) mm
Mass density kg / m3: ≥ 400
Single cycle time S: 29
Motor power KW: 7.5
Cylinder travel: 900-1200MM
Machine dimensions mm: length 1450 * width 1050 * high 3100.
Machine weight t; 1.4.
Hydraulic baler instructions
Manual instruction
First, the installation steps
A
1, the machine must be placed on the concrete, the basic depending on the local situation.
1. the machine need to be installed on the concrete ground reposefully, the basic requirement as the actual location.
2, check the bottom of the fuel tank is closed, to determine the closure and then open the top of the tank filling port seal.
2. Need to check the oil box's bottom which outlet whether closed or not, after closed caus then open the top of oil box and add the sealing cover for the top orifice.
Injection of about 60KG68 # hydraulic oil, hydraulic oil row number as the local temperature and the use of standard decisions. [Note! If the model is above 60T, the new machine must be filled with oil twice, the first time into the hydraulic oil height to the top of the dipstick (blue line). Press the press down to the bottom and then add the hydraulic oil to the bottom of the dipstick (red border) see the operating instructions in detail 4]
Immit around 60kgs No.68 # hydraulic oil, the optimal hydraulic oil shall be controlled or by the local city's no temperature & operation. [Remark: if the machine model will be more 50T, the new machine must separate to immit the hydraulic oil For the times the first time to immit till the hydraulic oil's height to the top of oil meter (the blue color line). After the compressing plate move to the bottom then add the hydraulic oil again till the bottom of oil meter (the red Line), the details please check & study the operation 4].
3, the installation of the local power cord, voltage and frequency depending on the local power supply decision, (Note! Motor and electrical parts of the voltage and frequency of customer orders have been ordered to install the machine installed) conventional three-phase four-wire system, three With the power cord, respectively, into the electrical phase of the corresponding three wiring bits (Figure 7 left) and the other for the ground leakage protection line, should be exposed to the body exposed metal surface to prevent electrical leakage wounding.
3. According to the local city which voltage, frequency & phase to install the machine's electric wires, (remark: the motor & electrical parts will be installed exactly as the buyer's requirements when ordered the machine.) Normally use the 3 phase & 4 lines , And 3 pieces of electrical wires of them will be connected into the phase which relevant 3 connectors, (Picture 7 left), another line will be connected the ground for defending the creepage, the line shall be tightly connected the outside metal's surface of the Machine's body
Second, the operation method:
2. Methods of operation
1, access to power: the air box inside the air switch (the main switch) to close, first check the three-phase power supply voltage is normal, (with a meter or probe pen test) to close the electrical phase door, see the power of the door surface red power Whether the indicator light is on.
1. With the power: close the air switch of the electrical box (main switch of the machine), check the
Door opening, then the whole machine can not start. When the machine full of the materials
3 phase voltage whether is normal first (use the ammeter or electrical pen for testing), and closed the Electrical Phase door, then check surface red lamp of the phase door's plate
2, start the motor: the manual valve handle (pay Figure 3) down to the bottom (the body with the operation icon), and then press the button NO button (Figure 5 lower right), (Note: if installed There are emergency stop switch models, please put the emergency stop switch in the direction of the arrow, the emergency stop switch can pop up), (Figure 5 on the right) as normal under the motor start.
2. Start running motor: remove the manual changing direction handle (with picture 3) to the bottom (the machine with the operating sign), then impress the starter NO button (with the Picture 5 right down direction), (remark: if installed The following case of the crucible
3, check the motor steering: (Figure 8) After the motor starts, manual valve handle in the lowest position, such as the pressure plate can not move down. In this case, you must immediately check whether the direction of rotation of the motor is correct and the direction of rotation of the motor must be in the direction indicated by the arrow. If the motor turns to the opposite when the machine can not be used normally, then the manual valve handle should be pulled up to the mid-range position. Then press the stop button OFF (or the emergency stop switch is pressed) to stop the motor from running. Cut off the total input power, the three-phase power cord which can be connected to the two-phase line. And then press operations 1 and 2 to re-operate, (Note! Must determine whether the motor steering direction is consistent with the arrow.)
3. check the motor's rotary direction: (with picture 8) after the motor started, when the manual changing direction valve handle which location is the lowest, if the compressing plate can not remove down, then must check the motor's rotary side Immediately, the rotary direction of motor must same as the arrowhead's direction. If the motor's rotary direction is reverse then the machine can not run normally, then shall remove the manual changing valve handle up to the middle location, and impress the stopping switch OFF ( Or damage the emergency shutdown switch to to running running. Also turn off the electric power, and change the 2 phase lines of 3 phase lines then connect them again. And according to the Methods of operations 1. & (Remark: must sure the motor's rotary direction any same as the arrowhead's direction.)
4, into the fuel of the key: When the pressure plate down the normal move, the pressure plate in the first move, the movement speed is not uniform. To be pressed to move to the bottom or move suddenly stop or move the noise increases, in which case the manual valve should be pulled up to the middle of the handle, stop the switch OFF or emergency stop switch, stop the motor run. And then carefully check the tank oil storage is sufficient, such as oil at the end of the fuel tank height of half, to prove that the amount of oil, then again should be injected into the tank appropriate hydraulic oil. The amount of fuel should be added to the bottom line of the oil level (red line) can be.
4. the linchpin to immit the hydraulic oil: when remove the compressing plate down, when the compressing plate moving during the first time, the moving speed will be difference. After the compress plate moved to the bottom or during moving still stopping or during moving The noise was increased, during the condition then will remove up the manual changing valve handle to the middle location, impress the stopping switch OFF or emergency switch, st